![](https://gnitergroup.com/wp-content/uploads/2023/01/Kplo_rendered_image.png)
Orbiter was launched on August 5 and reached the above orbit on December 28. The Danuri Orbiter Mission is intended to conduct surveys of solid water, helium-3 and silicon on the Moon and precedes the Lander + Rover mission planned for 2025.
![](https://gnitergroup.com/wp-content/uploads/2023/01/20220606000183_0-1024x671.jpg)
Image of the Moon captured by the Orbiter’s camera on December 24, 2022. and land in the background.
![](https://gnitergroup.com/wp-content/uploads/2023/01/FB_IMG_1673348572816.jpg)
Recent Comments