![](https://gnitergroup.com/wp-content/uploads/2023/05/maxresdefault-3-1024x576.jpg)
Lander on top of Propulsion Module and Rover inside Lander.
![](https://gnitergroup.com/wp-content/uploads/2023/05/Picture2.jpg.webp)
It is planned to be placed on top of the upper stage of the LMV3 rocket and launched in the second half of 2023.
![](https://gnitergroup.com/wp-content/uploads/2023/05/Chandrayaan-3_Integrated_Module_going_through_Dynamic_Testing_04-1-683x1024.webp)
The Propulsion Module and Lander will be in this configuration from Trans Lunar Injection until reaching the 100 Km Circular Orbit around the Moon. The detached lander will attempt a soft landing after sunrise at the landing site.
![](https://gnitergroup.com/wp-content/uploads/2023/05/Chandrayaan-3-1024x555.jpg)
After landing, the rover will remain there until sunset (14 Earth days). Lander’s tenure will be the same.
![](https://gnitergroup.com/wp-content/uploads/2023/05/Change-5_mission_profile-1024x523.png)
Recent Comments